Prime Horizontal Gallery of Case Histories


Adobe® Acrobat® Reader™ Software
Note: PDF files require Adobe® Acrobat® Reader™ software. Click on the above link to go to Adobe®'s download site. For quicker viewing of a PDF file in a Windows™ browser, download the file to your system first by right mouse clicking on the PDF icon and selecting "Save target as." If you are using a MAC operating system, click the mouse button while pressing the "Option" key and select "save target as".



SHORE APPROACHES



 
Spanish Desalinization Inputs
August 2003
Installation of 24 input filters for seawater to feed a desalinization plant near Barcelona, Spain. Entry points on the beach of the 24 feeder lines were required on 2 meter centers. The feeder lines fanned out horizontally as distance from the beach increased. The active surf zone prohibited use of conventional techniques.






TUNNELS



 
Piazza Giaribaldi, Naples Metro Station
In Progress
Prime Horizontal replaced another HDD contractor in the creation of 4 passenger galleries adjacent to the Metro train tunnels in the new Naples Metro Underground in Piazza Garibaldi. Guide over 400 bores for ground consolidation using a freeze hole process. Centers are 0.6 meters for each of four 50 m passenger galleries.





next