Prime Horizontal Milestones...
Since its inception, Prime Horizontal has been the driver, co-developer with Vector Magnetics and the prime user of ParaTrack. As a result, Prime Horizontal is considered the foremost authority on the deployment of the ParaTrack system in all horizontal directional drilling applications.

Prime continues to be a prime driver for new developments of ParaTrack and continues to be a co-developer with Vector Magnetics.

Together, they have introduced ParaTrack-1, ParaTrack-2, the Rotating Magnet Source (RM), The Pressure While Drilling Tool (PWD) and the AC Beacon.

Following are several milestones in the history of Prime Horizontal since 1998:

1998Prime Horizontal (Prime) and Vector Magnetics (Vector) enter a co-development agreement to commercialize new tracking methodology for the HDD market originally developed by Vector for the downhole oilfield market.
April 1999Prime successfully completes first ParaTrack HDD feasibility project in France.
1999Prime obtains product line of DDI Rock Reamer Hole Opener and carries inventory in UK from 4” through 62”
August 1999Prime successfully completes first 3 commercial ParaTrack-1 projects of three 1,100 meter crossings using a guidewire installed inside a 36” steel product line within a 3 meter corridor.
September 2000Prime introduces ParaTrack-2 by guiding a crossing in Falmouth Harbor.
November 2000Prime successfully replaces competition and completes a ParaTrack-2 project in Holland where a number of re-drills had occurred due to heavy magnetic Interference.
Mid 2001Prime successfully guides the first planned underground intersect in Holland, proving the value of the technique.
2001Prime becomes the Sharewell agent for provision of the Lo-Torque Hole Opener and maintains large inventory in Holland from 6” through 64”
April 2002Prime successfully guides the first hard rock underground intersect in France by introducing Vector’s Rotating Magnetic Source to the market.
November 2002Prime Introduces Vector's Pressure While Drilling (PWD) tool to the horizontal directional drilling (HDD) market to avoid mud overpressures downhole.
June 2003Prime successfully guides the fourth planned underground intersect, the first in the U.S.A.
August 2003Prime replaces competition in Alaska where ParaTrack-2 is used to track with the guidewire offset more than 200 feet Away.
November 2003Prime Introduces the AC Beacon to the HDD market in Europe—the first surface wireless magnetic source.
2004Prime begins production and sale of large diameter Split Bit Hole Openers from 36” through 64”

LINK TO HOME PAGE